Modular Data Center Site Developer

Capital. Capacity.
Delivered.

Spartan Data Centers develops modular data center sites — bridging the gap between power-ready land and GPU tenants who need production-ready capacity in under 12 months. We target 6 to 9 months from site control to commissioning.

CapacitySub-MW to 20+ MW
Delivery6 – 9 months, site to commissioning
FormPrefabricated modular & multi-story steel
Scroll
01 — What We Deliver

Three capabilities, one integrated platform.

The AI build-out needs more than hardware. It needs capital, speed, and tenants ready to fill capacity the moment it energizes. Spartan brings all three under one contract.

01

Capital & Financing

Sponsor equity, project finance, and development capital structured for modular AI data center builds — from site control through commissioning.

02

Modular Build System

Factory-integrated mechanical, electrical, and IT architecture that compresses construction timelines and removes field-build risk.

03

GPU Tenant Access

Neocloud and enterprise tenant sourcing, lease structuring, and capacity reservation — unlocking sites for GPU users who can’t find land-ready capacity anywhere else.

Single-story modular data center building
02 — System

NVIDIA-Validated Modular Build System

We provide a reliable modular build system that supports a wide range of hardware — from H100s to B300 and Rubin. Every design is developed in close collaboration with NVIDIA to ensure customer success.

  • H100, B200, B300, and Rubin GPU configurations
  • NVIDIA-validated designs for every deployment
  • Prefabricated steel modules with integrated MEP
  • Liquid-capable for next-generation GPU density
Large-scale single-story modular data center campus
03 — Scale

Adaptable from Sub-MW to Cloud Scale

Our design platform adapts from sub-MW air-cooled modules all the way to modular data halls supporting a 20+ MW cloud-scale cluster — the same system, scaled to your site and power envelope.

  • Sub-MW air-cooled modules to 20+ MW cluster deployments
  • Steel-frame prefab with site-integrated chiller plant
  • Parallel factory + site work compresses critical path
  • Optimized power-per-acre for constrained sites
04 — Supply Chain

From the factory to your site.

Our manufacturing partnerships mean components arrive pre-assembled and pre-tested. Field crews install — they don’t fabricate. That is how timelines collapse.

Integrated piping and mechanical systems inside modular unit Factory floor cooling coil assembly IT rack integration and cable management at factory Finished modular interior corridor ready for shipment
05 — Development Timeline

Site control to commissioning in 6 to 9 months.

Parallelized design, permitting, and factory fabrication compress a timeline that takes traditional stick-build two years or more.

01

Design

1 Month
02

Permitting

1 Month
03

Manufacturing

1–3 Months
04

Shipping & Delivery

1.5 Months
05

Commissioning

1 Month
Total site-to-production: 6 to 9 months. Parallelized with power interconnection and tenant fit-out.
07 — Contact

Let’s build capacity together.

For tenant inquiries, site opportunities, capital partnership, or general questions — reach out directly.